As the title says it going to be a bit of a challenge getting the old van back on the road.
She’s been laying resting up for over a wear now
A do like a challenge.
Things I will have to do
1 complete brake up grade service
New shoes and slave piping as required
2 change front shocks springs
3 New wheel bearings all round
4 cv joint replacement both sides
5 change tires all fore corners
6 a fare bit of welding
7 tidy up all round
8 pop engine and gear box out
9 replace timing belt
10 have gearbox over haled
11 air assist suspension dependant on availability for the alco system torchion bar
As it challenges.
I am expecting a fare few other things to crop up it is a 1990 after all
Looking at a timeframe of beginning of September
Working on it two to three days a week
On the mechanical and engineering aspects
With some farly involved habitation work to be don
This forum is the best thing I have found for keeping a living record and track of my projects
Haven’t started it in over three months since we bough it from our old house
Wildbill
She’s been laying resting up for over a wear now
A do like a challenge.
Things I will have to do
1 complete brake up grade service
New shoes and slave piping as required
2 change front shocks springs
3 New wheel bearings all round
4 cv joint replacement both sides
5 change tires all fore corners
6 a fare bit of welding
7 tidy up all round
8 pop engine and gear box out
9 replace timing belt
10 have gearbox over haled
11 air assist suspension dependant on availability for the alco system torchion bar
As it challenges.
I am expecting a fare few other things to crop up it is a 1990 after all
Looking at a timeframe of beginning of September
Working on it two to three days a week
On the mechanical and engineering aspects
With some farly involved habitation work to be don
This forum is the best thing I have found for keeping a living record and track of my projects
Haven’t started it in over three months since we bough it from our old house
Wildbill