Progress is a little slow with the 750 floor, but it’s coming on. West System Epoxy has arrived including microfibres for thickening.
Made and installed bottom wall plate from rear wheel arch to back corner and the first floor edge timber is now bonded to it.
I painted all timbers with West System using 4” foam rolllers, then after thickening a new batch of epoxy bonded the timber to the lower wall.
A few more pics from inside. Started removing the floor bit by bit to leave myself a working platform inside.
Now the wall plate and first floor timber are in a firmly bonded, I am going to remove the section of floor surrounding the wheel arch and over the grey water tank. Once removed my next steps will be to layup 6mm ply that has been sealed completely with epoxy to form the bottom of the floor sandwich. Once this is in I will bond timber floor joists onto the base floor, infill with foam insulation 25mm thick and then laminate another 6mm ply to top the sandwich off.
More fun next weekend,
Made and installed bottom wall plate from rear wheel arch to back corner and the first floor edge timber is now bonded to it.
I painted all timbers with West System using 4” foam rolllers, then after thickening a new batch of epoxy bonded the timber to the lower wall.
A few more pics from inside. Started removing the floor bit by bit to leave myself a working platform inside.
Now the wall plate and first floor timber are in a firmly bonded, I am going to remove the section of floor surrounding the wheel arch and over the grey water tank. Once removed my next steps will be to layup 6mm ply that has been sealed completely with epoxy to form the bottom of the floor sandwich. Once this is in I will bond timber floor joists onto the base floor, infill with foam insulation 25mm thick and then laminate another 6mm ply to top the sandwich off.
More fun next weekend,