Hi all, I’ve posted this on here as reading other posts I think it’s possible to just pick up the 12v supply from the existing wiring when replacing a rmd 8505 and installing the t2160 instead I’m hoping someone could give just give me the heads up how to bridge the cbe distribution board.
I’ve attached the photos of my cbe RB550-LK linked to a pc320 control panel it’s from a LAIKA kreos 5009 2016.
I think you just need to bridge 3-4 on block 2 to make this happen as you do on the Carthago board, any assistance would be greatly appreciate






I’ve attached the photos of my cbe RB550-LK linked to a pc320 control panel it’s from a LAIKA kreos 5009 2016.
I think you just need to bridge 3-4 on block 2 to make this happen as you do on the Carthago board, any assistance would be greatly appreciate





