2x100w on roof, wired in parallel.
1x125w stand-alone, "plugged-in" when required.
I've previously connected the stand alone panel to the mppt in parallel with the others.
Is this acceptable practice, I ask, belatedly, or should I put in a second mppt dedicated to this panel ?
1x125w stand-alone, "plugged-in" when required.
I've previously connected the stand alone panel to the mppt in parallel with the others.
Is this acceptable practice, I ask, belatedly, or should I put in a second mppt dedicated to this panel ?