- Aug 18, 2014
- 25,983
- 155,834
- Funster No
- 32,898
- MH
- Transit PVC
- Exp
- 16 years since restarting
Probably & far in excess of its design capacity + addition for 'future' exànsion. It should never have been a bridege due to having to shut for windspeed. Absolutely ludicrous. It also should have been built earlier & as soon as finished the next one started.I suppose it hasn't got anything to do with the sheer number of vehicles trying the use the road by any chance
That's because they aren't part of the M25 but are the A282.The bridge and tunnel are the only parts of the m25 where speeds limits are not ignored.
https://www.roads.org.uk/motorway/m25
Doesn't really matter what day or time as I've sat in 4+ mile queues at most times of the day.Travelling on a Friday is always going to be busier than a Thursday. Common sense would suggest missing rush hour around London but the DC tends to grind to a crawl after 1000hr so aim to be there for 0900.
Don’t travel on a Friday it is the busiest day or Monday mornings.
Don’t think that Highways England can take the blame for all of that.
& suffer the shambles around southampton?BF to Portsmouth everytime for me, especially from SW France.
That's ok as long as there are no road works shutting it in one direction so forcing everyone to go the opposite way & leading to 10mile queues at the crossingbest bet is to go through late at night or very early.