i remember reading somewhere that the order in which you initially connect the your wires from your solar panel and leisure batteries to your MPPT was important, but i cannot remember if it was the leisure batteries or the solar panels that should be connected to the MPPT first.
Also in my set up i have a sterling battery monitor with the Shunt on the negative to measure all input & outputs to the Leisure batteries , should i connect my negative from my MPPT controller to the batteries so that it goes through the Shunt , or should i connect it directly to the negative on my battery bank.
Also in my set up i have a sterling battery monitor with the Shunt on the negative to measure all input & outputs to the Leisure batteries , should i connect my negative from my MPPT controller to the batteries so that it goes through the Shunt , or should i connect it directly to the negative on my battery bank.