Kettle with long lead (1 Viewer)

Jan 13, 2014
3,639
11,776
Leeds - Yorkshire
Funster No
29,678
MH
Coachbuilt
Exp
40+
We are having a little problem locating a kettle 800/1000W but with a longish lead,when you look at the descriptions they don’t mention the length and we are currently having to do a bit of a balancing act which is dangerous in getting the heating base connected to the 240v outlet.

Any recommendations gratefully welcome.
 
OP
OP
Littlewheels
Jan 13, 2014
3,639
11,776
Leeds - Yorkshire
Funster No
29,678
MH
Coachbuilt
Exp
40+
Why not just fit a longer lead to the kettle
Not so easy these days as the wiring is factory sealed.

or just use a shot extension lead from socket
Not safe or secure on a worktop.

Kettle leads are kept short for safety reasons.
Why not get a whistle kettle and use gas 👍
Gas would be a backword step when we have a system that copes with electric usage.

The leads used to be longer they are only about 70cm now.

Subscribers  do not see these advertisements

 

Riverbankannie

LIFE MEMBER
Mar 11, 2016
10,663
62,233
Bristol
Funster No
41,967
MH
IH 630 RL PVC
Exp
12
I have similar problem as 240 outlet under the overhead locker. The lead only just reaches the worktop as long as the kettle sits on the (often wet) sink draining board. ! An extension lead would just be an extra danger.
 

Bailey58

LIFE MEMBER
Jun 23, 2010
8,858
30,183
Norfolk and Toftir.
Funster No
12,267
MH
Sold
Exp
July 2010 (ex tugger)

Bobby-gg

LIFE MEMBER
Feb 28, 2020
1,074
2,439
Northumberland
Funster No
69,066
MH
Ducato IH pvc
Exp
Since 2010
The kettle sits on a prewired base.
Ah, you didn't mention that.

Ours at home was far too long, but you could actually dismantle the base on it, so I shortened the cable.
Can you dismantle your base to do the opposite?
 

Bailey58

LIFE MEMBER
Jun 23, 2010
8,858
30,183
Norfolk and Toftir.
Funster No
12,267
MH
Sold
Exp
July 2010 (ex tugger)
Ah, you didn't mention that.

Ours at home was far too long, but you could actually dismantle the base on it, so I shortened the cable.
Can you dismantle your base to do the opposite?
I was answering the OP who did mention it "getting the heating base connected to the 240v outlet."
Edit: and Lenny HB has mentioned dismantling the base.
 
Nov 4, 2011
5,990
39,979
Uk
Funster No
18,763
MH
A class
Exp
2001
We have a 240 socket under the extractor on our Hymer, it’s above the sink.
I’ve got a short extension with 3 socket’s which is plugged into socket and then across to near cooker , fixed on side wall.
D958E71A-060D-4DE2-A678-814621587331.jpeg
 

Mark and Mindy

LIFE MEMBER
Oct 18, 2017
1,033
4,825
Nr Bicester
Funster No
51,006
MH
Adria Twin 640 SGX
Exp
Since 2019
We have this kettle for the motorhome. The flex is 70cm but it should be possible to open it up and fit a longer flex.


PXL_20230204_123945797.jpg

Subscribers  do not see these advertisements

 
OP
OP
Littlewheels
Jan 13, 2014
3,639
11,776
Leeds - Yorkshire
Funster No
29,678
MH
Coachbuilt
Exp
40+
Thanks to everyone for your suggestions it seems extending the lead is the way to go, l will have another look at the connection on the base.
 
Jul 6, 2009
1,830
2,274
Funster No
7,383
It alway amazes me on our Burstner there is a 240 volt socket facing downwards under the locker above the sink, so any steam from the sink rises straight up to it??
 

canopus

LIFE MEMBER
Nov 27, 2010
6,145
10,285
rural Lincolnshire
Funster No
14,552
MH
Carado CV640 Pro
Exp
Since 2010
Another reason many conventional kettle leads are short, is to prevent numpties filling from the tap without unplugging the kettle first from the supply.
 

Lenny HB

LIFE MEMBER
Oct 18, 2007
53,961
152,029
On the coast in West Sussex
Funster No
658
MH
Hymer B678 DL
Exp
Since 2008 & many years tugging
Another reason many conventional kettle leads are short, is to prevent numpties filling from the tap without unplugging the kettle first from the supply.
I don't think I've seen an electric kettle that has a lead directly on it for many years.
 
Feb 16, 2020
2,343
3,203
KT15.
Funster No
68,772
MH
Sunlight. T66. 2019.
Exp
Absolute beginners.
I don't think I've seen an electric kettle that has a lead directly on it for many years.
Here you go Lenny, our travel kettle, dual voltage, but with a short lead. Had this quite a while, but it's shape makes it really useful for suitcases.
Mike.

20230209_165104.jpg

Subscribers  do not see these advertisements

 

Lenny HB

LIFE MEMBER
Oct 18, 2007
53,961
152,029
On the coast in West Sussex
Funster No
658
MH
Hymer B678 DL
Exp
Since 2008 & many years tugging
Here you go Lenny, our travel kettle, dual voltage, but with a short lead. Had this quite a while, but it's shape makes it really useful for suitcases.
Mike.

View attachment 714915
I did say for many years but not what I was thinking l was thinking of one with an IEC socket.
Nearly all of them have a seperate base they sit on now.
 
Last edited:
Nov 13, 2011
1,485
3,540
Lincolnshire
Funster No
18,889
MH
PVC
Exp
30 years
Would it not be possible to fit an additional 13amp outlet in the position you want it. Job done, nice short kettle lead and leaves the existing outlet for other items.
Well that's what I would do.

Geoff
 

stuartholmes

LIFE MEMBER
Nov 18, 2022
397
572
Nottingham
Funster No
92,522
MH
Murvi Morello
Exp
Since 1989
I think small electrical appliances have small leads because they have to be safe in the hands of people with small brains.

I'm replacing the lead on our 'van kettle and toaster and induction hob because the plug supply socket is too far from the only sensible worktop.

I won't be able to re-use the moulded on plugs but I have a good set of screwdrivers, and a stanley knife and I know which is which of brown blue & green.

The leads will run at the back of the worktop, away from danger and all will be well. Much better than struggling with appliances all crowded round the socket or competing with the gas hob & the sink.
 

stuartholmes

LIFE MEMBER
Nov 18, 2022
397
572
Nottingham
Funster No
92,522
MH
Murvi Morello
Exp
Since 1989
Another reason many conventional kettle leads are short, is to prevent numpties filling from the tap without unplugging the kettle first from the supply.
I think it's also to prevent the possibility of trailing wires hanging over the edge of the worktop & catching on stuff that results in the appliance getting pulled off. They're trying to take account of people who'd ideally not be allowed in the kitchen at all.

Subscribers  do not see these advertisements

 

Join us or log in to post a reply.

To join in you must be a member of MotorhomeFun

Join MotorhomeFun

Join us, it quick and easy!

Log in

Already a member? Log in here.

Latest journal entries

Funsters who are viewing this thread

Back
Top